You don't have javascript enabled. Good luck with that.
Pencarian
 Saluran Phb Jalur Elok Raya Dikeruk

Connecting Channel on Jalan Janur Elok Raya Dredged

Our completion tar get is in early September

A connecting channel on Jalan Elok Raya, RW 06, Kelapa Gading Barat Urban Village, Kelapa Gading is dredged in order to prevent inundation when it rains.

Connecting Channel Built in Untung Jawa Island

Kelapa Gading Sub-district Executing Unit Head, Rukmana said that the channel that has 1,350 meters length with 8 meters width often overflows during rain season. 

"We will deepen around 1.5-2 meters from the existing one," he stated, Wednesday (8/14).

It has been carried out since last week by sending one excavator and seven dump trucks to transport mud.

"Our completion target is in early September," he said.

Linked News
Popular News indeks
  1. Transjakarta Adjusts Operations Due to Public Demonstration

    access_time12-06-2026 remove_red_eye1937 personAldi Geri Lumban Tobing
  2. Pramono: Transjabodetabek Fare Adjustment Based on Careful Consideration

    access_time10-06-2026 remove_red_eye1026 personDessy Suciati
  3. BTN JAKIM 2026, Traffic Engineering and Alternative Routes Provided

    access_time11-06-2026 remove_red_eye867 personAldi Geri Lumban Tobing
  4. Accelerating Jakarta`s Global City Development, Pramono Inaugurates Urban Knowledge Hub

    access_time08-06-2026 remove_red_eye792 personDessy Suciati
  5. BTN JAKIM 2026: Pramono Invites Everyone to Have Fun While Running

    access_time13-06-2026 remove_red_eye731 personFakhrizal Fakhri
KONTAK KAMI
Berita Jakarta Berita Jakarta TV

Jl. Medan Merdeka Selatan 8-9 Blok F Lt. II Jakarta
local_phone +62 21 3822356
email redaksi@beritajakarta.id

TAUTAN LAINNYA
Tentang Kami | Sitemap | Infografis

© copyright 2001 - 2026 All Rights Reserved