You don't have javascript enabled. Good luck with that.
Pencarian
 Saluran Phb Jalur Elok Raya Dikeruk
.
photo Budhi Firmansyah Surapati - Beritajakarta.id

Connecting Channel on Jalan Janur Elok Raya Dredged

Our completion tar get is in early September

A connecting channel on Jalan Elok Raya, RW 06, Kelapa Gading Barat Urban Village, Kelapa Gading is dredged in order to prevent inundation when it rains.

Connecting Channel Built in Untung Jawa Island

Kelapa Gading Sub-district Executing Unit Head, Rukmana said that the channel that has 1,350 meters length with 8 meters width often overflows during rain season. 

"We will deepen around 1.5-2 meters from the existing one," he stated, Wednesday (8/14).

It has been carried out since last week by sending one excavator and seven dump trucks to transport mud.

"Our completion target is in early September," he said.

Linked News
Popular News indeks
  1. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye357 personTiyo Surya Sakti
  2. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye329 personAldi Geri Lumban Tobing
  3. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye319 personAldi Geri Lumban Tobing
  4. Smoke-Free Neighborhoods Could Be a Pilot Project for the KTR Regional Regulation Implementation

    access_time18-07-2025 remove_red_eye263 personFakhrizal Fakhri
  5. Council Encourages the Increase of RPTRAs for Child Growth and Development

    access_time18-07-2025 remove_red_eye260 personFakhrizal Fakhri
KONTAK KAMI

Jl. Medan Merdeka Selatan 8-9 Blok F Lt. II Jakarta
local_phone +62 21 3822356
email redaksi@beritajakarta.id

TAUTAN LAINNYA
Tentang Kami | Sitemap | Infografis

© copyright 2001 - 2025 All Rights Reserved

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik