You don't have javascript enabled. Good luck with that.
Pencarian
 Saluran Phb Jalur Elok Raya Dikeruk
.
photo Budhi Firmansyah Surapati - Beritajakarta.id

Connecting Channel on Jalan Janur Elok Raya Dredged

Our completion tar get is in early September

A connecting channel on Jalan Elok Raya, RW 06, Kelapa Gading Barat Urban Village, Kelapa Gading is dredged in order to prevent inundation when it rains.

Connecting Channel Built in Untung Jawa Island

Kelapa Gading Sub-district Executing Unit Head, Rukmana said that the channel that has 1,350 meters length with 8 meters width often overflows during rain season. 

"We will deepen around 1.5-2 meters from the existing one," he stated, Wednesday (8/14).

It has been carried out since last week by sending one excavator and seven dump trucks to transport mud.

"Our completion target is in early September," he said.

Linked News
Popular News indeks
  1. MSMEs Bazaar Held at Binus Anggrek Campus

    access_time30-10-2024 remove_red_eye954 personTP Moan Simanjuntak
  2. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye660 personBudhi Firmansyah Surapati
  3. Satpol PP Expels Illegal Participants at Sudirman - Thamrin CFD

    access_time27-10-2024 remove_red_eye454 personBudhi Firmansyah Surapati
  4. South Jakarta City Government Accelerates Stop BABS

    access_time31-10-2024 remove_red_eye395 personTiyo Surya Sakti
  5. Traffic Arrangement Applied on Jalan Tambak

    access_time28-10-2024 remove_red_eye370 personAldi Geri Lumban Tobing
KONTAK KAMI

Jl. Medan Merdeka Selatan 8-9 Blok F Lt. II Jakarta
local_phone +62 21 3822356
email redaksi@beritajakarta.id

TAUTAN LAINNYA
Tentang Kami | Sitemap | Infografis

© copyright 2001 - 2024 All Rights Reserved